Muthu Nagar Beach Development

Categories
Completed Projects

Muthu Nagar Beach Development

Name of the Project: Muthu Nagar Beach Development –

Project cost (Rs.in Cr): 5.13

Description

The following provision are made for development of parks. Compound wall, security room,Toilet arrangements, Lighting facilities,Sitting benches,Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements ,CCTV camera and parking facilities.

Physical Progress: 89%

Project End Date: 30 Mar 2022

Smart Schools- 5 Nos

Categories
Completed Projects

Smart Schools- 5 Nos

Name of the Project: Smart Schools- 5 Nos

Project cost (Rs.in Cr): 9.24

Description:

A smart school is – as its name suggests – different from a traditional school. This is a kind of school where advanced equipment and technology are used to take the educational process forward. The main idea is to provide the students with a learning experience that is a lot better than what may otherwise have been possible. The idea of the project was to implement Smart Schools equipped with School Management System, Learning Management System, Safety Management, Classroom Infrastructure which leads to significant improvement in quality of education. In order to needs of the corporation, redevolpment of five municipal corporation schools was converted in to smart schools with necessary infrastructure.

Physical Progress: 98%

Project End Date:15 Mar 2022

UGSS-Internal Plumbing

Categories
Completed Projects

UGSS-Internal Plumbing

Name of the Project
UGSS-Internal Plumbing

Project cost (Rs.in Cr)
11.17

Description
Thoothukudi UGSS scheme was Sanctioned by GOI for 1072.00 lakhs and work was executed by TWAD board . It is proposed to internal plumbing arrangements for UGS HSC Connection from property to boundary at thoothukkudi corporation areas.In this scheme laying of sewage pipe line connected with manhole and providing HSC from manhole to property boundary area also executed.Main source of the STP collected through manhole from individual HSC.

Physical Progress
40%

Project End Date
30 Jun 2022

Multi Level Car Parking (Jeyaraj Road near Flower Market)

Categories
Completed Projects

Multi Level Car Parking (Jeyaraj Road near Flower Market)

Name of the Project
Multi Level Car Parking (Jeyaraj Road near Flower Market)

Project cost (Rs.in Cr)
10.57

Description
It is proposed to construct Multi Level Car Parking with the following provision are made in Parking area, Toilet arrangements, lighting facilities, internal roads, lift, Rental shops and water supply arrangements etc., in this work.

Physical Progress
98%

Project End Date
15 Mar 2022

Redevelopment of Buckle Odai

Categories
Completed Projects

Redevelopment of Buckle Odai

Name of the Project
Redevelopment of Buckle Odai

Project cost (Rs.in Cr)
53.45

Description
“It is proposed to develop various recreational activities at 7.2 kms on the both side of the Buckle odai. 1. Walkway cum Bicycle lane – uniform width of 3.0m on the both sides of the Buckle odai, 2. Jogging track with boulevard – uniform width of 2m on both sides of the buckle odai with Boulevard 0.9m and 0.6m – Total width of 3.5m, 3. Provision of Pedestrian footpath LED lights, 4. Development of Road for 7m wide along the Buckle odai, 5. Provision for diversion of Sewage water and installation of Modular STP – 500 KLD 3 Nos, 6. Providing fencing along the Buckle odai – 1m height & Refurbishing the Buckle odai bed to enable free flow “

Physical Progress
100%

Project End Date
30 Apr 2024

Ground Mounted Solar to offset HT power supply

Development of Dhobikhana

Categories
Completed Projects

Development of Dhobikhana

Name of the Project: Development of Dhobikhana

Project cost (Rs.in Cr): 7.32

Description:

“Dhobi Khana is situated in the middle of the city. It is the only washing yard for Dhobi’s without any basic amenities and the existing provisions are in un-useable condition. •Prior to the implementation of Dhobi khana project under smart city scheme.The status of Dhobi khana area was an open area with a water body. •The said water body was not provided with any water sources, but completely dependent on the collected rain water by the water body during monsoon period. And this water was used by the dhobis to wash that dirty clothes and the effluent water after washing was let in to the water body. Thus the entire water body gets polluted causing health hazards in and around that area. •Hence this proposal for constructing Dhobi Khana with modern facilities are implemented.”

Physical Progress: 80%

Project End Date: 31 Mar 2022

Biometric Attendance System

Mobile Toilet Trailer -4 Nos

Categories
Completed Projects

Mobile Toilet Trailer -4 Nos

  • Name of the Project: Mobile Toilet Trailer -4 Nos
  • Project cost (Rs.in Cr): 0.24
  • Description:
    The mobile toilets are provided with one overhead water tank, two gents toilet and two ladies toilet with all other facilities.the mobile toilets are fitted on a trailer which can be easily towed to one place to another in a comfortable manner.
  • Physical Progress: 100%
  • Project End Date: 30 Nov 2018

Clean Thoothukudi App