Providing Stem Park at North Zone area

Categories
OnGoing Projects

Providing Stem Park at North Zone area

  • Name of the Project: Providing Stem Park at North Zone area
  • Project cost (Rs.in Cr): 14.71
  • Description:
    “The following provision are made mini-theatre, science zone, energy zone, Mathematics zone, engineering and material science, space zone, evolution park models, indoor exhibits, science on a sphere and among others. It would be a good revenue generating model and also attract visitors, especially students from other neighbouring cities. Moreover, for a city such as Thoothukudi, the STEM Park and the learning centre would be a boon as it lacked any worthy entertainment for residents,., “
  • Physical Progress: 10%
  • Project End Date: 30 Sep 2022

DMA Zonation for Water Supply system (ABD area)-Phase-I

Categories
OnGoing Projects

DMA Zonation for Water Supply system (ABD area)-Phase-I

  • Name of the Project: DMA Zonation for Water Supply system (ABD area)-Phase-I
  • Project cost (Rs.in Cr): 29.37
  • Description:
    “1.Providing total length of 4587m of channels for diversion of Kalangarai odai to periyapallam odai with motorable service as per NHAI guidelines and related works along NH -45B 2.Providing total length of 3885m of Strom water drain for diversion of flow of chengulam odai to upparu river and related works along NH -7A”
  • Physical Progress: 27%
  • Project End Date: 31 Oct 2022

System for the TCMC Water Supply Improvement Scheme

Categories
OnGoing Projects

System for the TCMC Water Supply Improvement Scheme

  • Name of the Project: Proposed Centralised SCADA system demand driven-Water Supply & Distribution Management System for the TCMC Water Supply Improvement Scheme
  • Project cost (Rs.in Cr): 8.47
  • Description:
    84 MLD of raw water from Intake Well located at 100m away from upstream of Maruthur Dam at Kaliyavoor in River Thamirabarani being pumped to the Water Treatment Plant at Keelavallanadu, with the supporting of 4 nos of 600HP/450KW Vertical Turbine Pump sets. It is designed to operate 2 Nos of 600HP Vertical Turbine Pump sets parallelly at a time to pump as per the designed quantity of 84 MLD raw water from the existing source. The pumped raw water conveyed through size of 1100mm dia SWMS pipe to Water Treatment Plant at Keelavallanadu for a distance 10.85Km.From the Water Treatment Plant at Keelavallanadu, the treated clear water will be gravitated to the beneficiaries of TCMC limit. The clear water transmission main of size 1200mm dia SWMS pipe is laid for the distance of 25 Kms with the provision of sufficient sluice valve / scour valve arrangements. According to the design of the project, the treated clear water is being feed through 30 Nos OHTS comprises 13 Feeder Main and segregated to 30 Zones.
  • Physical Progress: 65%
  • Project End Date: 31 Mar 2022

Badminton play ground with Gym at 5 Locations

Categories
OnGoing Projects

Badminton play ground with Gym at 5 Locations

  • Name of the Project: Badminton play ground with Gym at 5 LOocations
  • Project cost (Rs.in Cr): 6.25
  • Description:
    Construction of Badminton Court with indoor stadium and Smart Fitness Centre at Corporation area of 5 Locations in 1)Sundaravel puram. 2)Muthammal colony, 3)Pullthottam, 4) GLR, 5)Ashok Nagar.
  • Physical Progress: 35%
  • Project End Date: 30 Apr 2022

Construction of City Convention Centre near VVD OHT

Categories
OnGoing Projects

Construction of City Convention Centre near VVD OHT

  • Name of the Project: Construction of City Convention Centre near VVD OHT
  • Project cost (Rs.in Cr): 10.76
  • Description:
    It is proposed to construct Convention Centre of Overall Site area 1912 Sq.m (0.47 Acre) with Basement floor area 936 Sq.m, which has Parking which occupies 39 No of Two Wheelers and 21 Cars and Ground floor area 936 Sqm, which includes Kitchen, Store room, dining and Rest Room for Ladies and Gents. First floor aren 936 Sq.m which includes Green Room with attached toilet facility, Store room, Stage and seating capacity of 364 Numbers. Second floor area 444 Sq.m which includes Balcony of seating capacity 166 Numbers. Head Room area 480 Sq.m
  • Physical Progress: 43%
  • Project End Date: 30 Apr 2022

Construction of Chidambaram Nagar Shopping Mall

Categories
OnGoing Projects

Construction of Chidambaram Nagar Shopping Mall

Name of the Project: Construction of Chidambaram Nagar Shopping Mall

Project cost (Rs.in Cr): 15.62

Description:

It is proposed to construct Commercial Complex of Overall Site area 2947 Sq.m (0.73 Acre) with Basement floor area 1551 Sq.m, which has Parking which occupies 68 No of Two Wheelers and 33 Cars and Ground floor area 1446 Sq.m, which includes 15 No of Shops of varying size and Rest Room for Ladies and Gents. First floor area 1446 Sq.m which includes 17 No of Shops of varying size and Rest Room for Ladies and Gents, Second floor area 1446 Sq.m which includes 8 No of Shops of varying size, Restaurant with Kitchen attached, Boutique, Game arena and Rest Room for Ladies and Gents and Third floor area 1446 Sq.m which includes 2 No of Theatre of varying size having seating capacity of 580 seats and Food court with Kitchen attached.

Physical Progress: 34%

Project End Date: 07 Aug 2022

Redevelopment of Old Bus Stand

Categories
OnGoing Projects

Redevelopment of Old Bus Stand

Name of the Project: Redevelopment of Old Bus Stand

Project cost (Rs.in Cr): 55.67

Description:

It is proposed to construct Bus Terminal Development, Public Transport Improvement and transit hub of Overall area 3.36 acres with Ground floor area (Build up) of 13359 Sq.m and Ground floor area (Commercial) of 2295.52 Sq.m which includes Department office 1 Nos, other menities 16 Nos and ATM 2 Nos. Number of Bus Bays has given 29 Nos. First Floor . commercial area 2295.52 Sq.m and Parking area 2865.23 Sq.m which occupies 384 No of Two Wheelers and also second & third floor commercial area 2295.52 Sq.m and Parking area 2865.23 Sq.m which occupies 384 No of Two Wheelers and Fourth Floor Area 1864.18 Sq.m

Physical Progress: 80%

Project End Date: 30 Apr 2022

Storm water drain for Flood Mitigation

Construction of Storm Water Drain –ABD area – Phase II

Categories
OnGoing Projects

Construction of Storm Water Drain –ABD area – Phase II

Name of the Project: Construction of Storm Water Drain –ABD area – Phase II

Project cost (Rs.in Cr): 81.36

Description:

“1. Providing total length of 4711m of Storm Water Drain Along south cotton road (Joins to George Road), Drain along North Raja Street, Drain Along East Coast Road joins to Sea, Along Victoria Extension road & Branch Joined to George Road (Left & Right side of Road), Along Devispuram Road to Buckal Canal, Joins to SBI colony main Drain and Along Devispuram and Disposed to Buckal Canal . 2.Providing total length of 6974m of Strom Water Drain Along cross road from Palayamkottai road to Buckal Canal, Teachers Colony and Disposed Buckal Canal, Teachers Colony Main Road and Disposed to Buckal Canal, Along Millerpuram Main Road and Disposed to Buckal Canal, Along TMB Colony Main Road and Disposed to Buckal Canal, Along Millerpuram East Main Road and Disposed to Buckal Canal. 3.Providing total length of 7010m of Strom Water Drain from New colony to Sea (Via George Road road), Geetha Jeevan Nagar to Sea “

Physical Progress: 95%

Project End Date: 30 Apr 2022

Muthu Nagar Beach Development

Categories
Completed Projects

Muthu Nagar Beach Development

Name of the Project: Muthu Nagar Beach Development –

Project cost (Rs.in Cr): 5.13

Description

The following provision are made for development of parks. Compound wall, security room,Toilet arrangements, Lighting facilities,Sitting benches,Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements ,CCTV camera and parking facilities.

Physical Progress: 89%

Project End Date: 30 Mar 2022