Skip to the content
System for the TCMC Water Supply Improvement Scheme
- Name of the Project: Proposed Centralised SCADA system demand driven-Water Supply & Distribution Management System for the TCMC Water Supply Improvement Scheme
- Project cost (Rs.in Cr): 8.47
- Description:
84 MLD of raw water from Intake Well located at 100m away from upstream of Maruthur Dam at Kaliyavoor in River Thamirabarani being pumped to the Water Treatment Plant at Keelavallanadu, with the supporting of 4 nos of 600HP/450KW Vertical Turbine Pump sets. It is designed to operate 2 Nos of 600HP Vertical Turbine Pump sets parallelly at a time to pump as per the designed quantity of 84 MLD raw water from the existing source. The pumped raw water conveyed through size of 1100mm dia SWMS pipe to Water Treatment Plant at Keelavallanadu for a distance 10.85Km.From the Water Treatment Plant at Keelavallanadu, the treated clear water will be gravitated to the beneficiaries of TCMC limit. The clear water transmission main of size 1200mm dia SWMS pipe is laid for the distance of 25 Kms with the provision of sufficient sluice valve / scour valve arrangements. According to the design of the project, the treated clear water is being feed through 30 Nos OHTS comprises 13 Feeder Main and segregated to 30 Zones.
- Physical Progress: 65%
- Project End Date: 31 Mar 2022