Providing planetorium arrangements at palaymkottai road park

  • Name of the Project: Providing planetorium arrangements at palaymkottai road park
  • Project cost (Rs.in Cr): 1.67
  • Description:
    “The following provision are made in Park 1. Supply and Fixing of Sm Dome Streel Truss and Aluminium Frame 8m Outer cover, 8m Inner screen with N pressure fan-scamless screen grey color,thick fabric wwith Negative pressure inline duct fan (Patent of company)the rate includes all cost and conveyence 2. Supply and Fixing of Vivitek DU 7098z projectors with mounts Individual brightness 7000 ANSI lumnes, Contrast :20,000:1, Resolution :3840x2160pixels, Light source life (lamp- free, laset): 20,000 hours(Normal mode) the rate includes all cost and conveyence of materials materials and Jabour charges etc, complete 3. Supply and Fixing of Single Server solutions Case :4U,MB:Asus x99-MWS,CPU: Xeon E5- 1620v4,Memory :32GBDDR42400, VGA:2xNvidiaGTX 1070TI or Quadro, HDD:SSD and labour charges etc, complete Samsung PRO2TB+ backup OS: linux ,Oneserver outpus 4 Full HD images wireless and remote control fucntion with ipad fisheye lens nikon camera „Fully automatic calibration S/W,25 contenet moives from full dome library the rate includes all cost and conveyence of materials and labour charges ete, complete 4. Supply and Fixing of Surround sound system 5.1 Behringer B1200D-pro Eurolive spcaker OSL oliver systems pro 8 self Powered 8inch bass -reflex speaker the rate includes all cost and conveyence of materials and labour charges etc, complete 5. Supply and Fixing of Other projection equipment Video cables for projectors (C&E 25ft 40t/50f high speed Ultra 4K HDMI cable with Ethernet gold) (OXCORD 3core Round copper wires 45M)Cantrol cables for projector (I.ive tech Cat 6 Lan Ethernet cable (305M) the rate includes all cost and conveycnce of materials and labour charges etc, complete 6. Supply and Fixing of Custom fee,Clearence Transfer the rate includes all cost and conveyence of materials and labour charges etc, complete 7. Supply and Fixing of Air line Transportation the rate includes all cost and conveyence of niaterials and labour charges ctc, complete 8. Supply and Fixing of Project Managements the rate includes all cost and conveyence of materials and labour charges etc, complete 9. Supply and Fixing of Installation Team expenses the rate includes all cost and conveyence of materials and labour charges etc, complete 10. Stretcch fabric full system with aphony fibrette 15mm size 300x1200mm providing and fixing of Himalayan Acou sticks strech fabric system on Gi studs, 2400mum x50mm the angls |Sand 50nım fully kirurled giving it cyc strength hot dippes galvanized steel with 120gsm sink coating specially designed for aqua stick vibration managemnet and long life with backing S0mm thick insulation: APUONY fibrette 300x1200x20mum tile with NRC 1.00 to be mechanically fastermed on the Gl studs aquastical of observe wool 10mn which is ashered tô the Aqua stic pancl on the front side then 12mm/20mm vinyl tracksare screw. fixed on the Ginn ply and aquua stic panel then fabric is strech over the vinyl tracks the installed system should provide NRC of 1:00 fabric colour as per Architech choice ref. atached specialisation Got more details to be installed on GI Sutds 300x300mm cente to centre vertically strength or gripped galvanized steel with 120gsm sink coating specially designed for aqua stick vibratiobn management and long life with backing of himalayan aqua stick 50mm thick 2400mmx50mm per thickness 0.50mm and anges 15 and 50mm fiully kirurled giving in high 1000 GSM absorved wool tested as per Fire retardanta ASTMD 635/1991 insulation and IS 15061/2002 for excellent result 11. Providing fixing of Aqua stick door of 50mm having an STC rating upto 40 the door will be filled with hight Aqua stick materials of 2 layers of 2mm ISO sealed , 8mm Water proof Aqua stick ply and 30mm compressed insulation. Door frame will be made of wood frame on all sides 12. Supply and Fixing of SRO2 with tipup and back bush 20(inch)the rate includes all cost and conveyance of materials and labour charges etc,. “
  • Physical Progress: 100%
  • Project End Date: 31 Dec 2021