Construction of 28mld STP

  • Name of the Project: Construction of 28mld STP
  • Project cost (Rs.in Cr): 50.05
  • Description:
    “The proposed STP is located at Tharuvaikulam. All the sewages are collected and pumped to the STP, where the sewages are treated and the waste water is further treated for usebale condition , which can be used in farms and for industrial purposes. The wastes collected after treatment of the sewages is used for making Bio-Gas and also for electric power generations and the power thus generated is proposed to be utilized for the power requirements in the STP and nearby utilities. “
  • Physical Progress: 100%
  • Project End Date: 31 Dec 2021