- Name of the Project: Construction of Corporation study Centre at Chidambaranagar
- Project cost (Rs.in Cr): 1.59
- Description: Provision are Ground Floor to 2nd Floor, Ground Floor Parking, 1st Floor & 2nd Floor are Study Hall with Toilet Facility, Electrical arrangements, Water supply arrangements, etc,.
- Physical Progress: 55%
- Project End Date: 31 Mar 2022
Construction of Corporation study centre at chidambaranagar
Smart Bus Depo for TNSTC at New Bus stand
- Name of the Project: Smart Bus Depo for TNSTC at New Bus stand
- Project cost (Rs.in Cr): 9.41
- Description: “It is Proposed to construct TNSTC Depot Building with overall area of 1.94 acres with maintaince shed in the ground floor, Regional office in the second floor, Divitional office at second floor with restricted access ladies dormitory with capacity of 25 persons, Dormitory building for male staff with 200 person capacity in the third floor, kitchen cum dining hall has been provided with dormitory and separate recreational club ha been provided for mal and female staff. “
- Physical Progress: 67%
- Project End Date: 31 May 2022
Construction of Resource Recovery Centre at kathirvel nagar
- Name of the Project: Construction of Resource Recovery Centre at kathirvel nagar
- Project cost (Rs.in Cr): 2.07
- Description: “RRC – Resource Recovery Centre 2 to 2.5 Tons of waste can be segregate in the RRC per day Provisions : Batching Maching, Weighing Machine, Segration Mation, Incinator, Type of Materials can be Segregate : Cloths, Brass Materials, Wooden Materials, Rubber Materials, E-Waste Materials, Metals items, Glass materials, Plastic Materials, Bags, Bottle, Cheppls etc,.”
- Physical Progress: 44%
- Project End Date: 31 Mar 2022
Construction of Sensory park at Sivanthakulam corporation school campus
- Name of the Project: Construction of Sensory park at Sivanthakulam corporation school campus
- Project cost (Rs.in Cr): 1.47
- Description: The following provision are made in compound wall ,security room, Toilet arrangements, lighting facilities, sitting benches, foot path, play field arrangement ,Green space and water supply arrangements.This park is provided with materials useful for physically challenged persons and kids . They will have touch and feel effects while playing in the park.
- Physical Progress: 42%
- Project End Date: 31 Mar 2022
Providing Integrated Command and Control Center at Corporation.
- Name of the Project: Providing Integrated Command and Control Center at Corp oration.
- Project cost (Rs.in Cr): 10.48
- Description: To make the command & control centre act as a fulcrum in effectively integrating most of the envisaged smart city works, and also to prioritize the needs of the Departments and Citizens. The DPR was prepared by framing the Scope of Work, Project Solution Architecture, Functional & Technical requirements “
- Physical Progress: 85%
- Project End Date: 31 Mar 2022
Sanitary Land fill & Biomining
Categories
Sanitary Land fill & Biomining
- Name of the Project: Sanitary Land fill & Biomining
- Project cost (Rs.in Cr): 17.69
- Description: “Reduction of Waste ny bio mining and waste processing followed by placement of residues in new landfills. Size of the site a defined by the total amount of solid waste and disposed of and degree of compaction. Characteristics of the wastes accepted by the site during the landfills active life. Concentrations and mass rate of release of both waterborne and airborne pollutants. Number of people and especially sensitive populations that could be influenced by the release of pollutants from the site.”
- Physical Progress: 25%
- Project End Date: 31 Oct 2022
DMA Zonation for Water Supply system (ABD area)-Phase II
- Name of the Project: DMA Zonation for Water Supply system (ABD area)-Phase II
- Project cost (Rs.in Cr): 29.46
- Description: Data collection, Field study, Reconnaisance Suvrey, Field Investigations has becce done on various factors and detailed Project Report prepared and conducted by TWIC for implementation.
- Physical Progress: 95%
- Project End Date: 31 Oct 2024
Development of commercial complex -3 locations
- Name of the Project: Development of commercial complex -3 locations
- Project cost (Rs.in Cr): 10.52
- Description:
“SOUTHCOTTON ROAD: Rental Space – 4 nos shops -17 nos BORDER BAZZAR Shops- 16 nos Restaurant – 2nos coffee Shop- 2 nos CARPENTER STREET Shops- 8 nos Show room rental space- 4 nos Coffee Shop, Foot court- 1no” - Physical Progress: 42%
- Project End Date: 30 Jul 2022
Providing New Open Space Parks -4Nos
- Name of the Project: Providing New Open Space Parks -4Nos
- Project cost (Rs.in Cr): 10.49
- Description:
The following provision are made for development of parks. Compound wall, security room, Toilet arrangements, Lighting facilities, Sitting benches, Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements etc. - Physical Progress: 30%
- Project End Date: 30 Jun 2022
Providing New Open Space Parks -8Nos
- Name of the Project: Providing New Open Space Parks -8Nos
- Project cost (Rs.in Cr): 13.88
- Description:
The following provision are made for development of parks. Compound wall, security room,Toilet arrangements, Lighting facilities,Sitting benches,Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements etc. - Physical Progress: 30%
- Project End Date: 30 Jun 2022