Author: xlmsmartcity

Providing Integrated Command and Control Center at Corporation.

Categories
OnGoing Projects

Providing Integrated Command and Control Center at Corporation.

  • Name of the Project: Providing Integrated Command and Control Center at Corp oration.
  • Project cost (Rs.in Cr): 10.48
  • Description: To make the command & control centre act as a fulcrum in effectively integrating most of the envisaged smart city works, and also to prioritize the needs of the Departments and Citizens. The DPR was prepared by framing the Scope of Work, Project Solution Architecture, Functional & Technical requirements “
  • Physical Progress: 85%
  • Project End Date: 31 Mar 2022

Sanitary Land fill & Biomining

Categories
OnGoing Projects

Sanitary Land fill & Biomining

  • Name of the Project: Sanitary Land fill & Biomining
  • Project cost (Rs.in Cr): 17.69
  • Description: “Reduction of Waste ny bio mining and waste processing followed by placement of residues in new landfills. Size of the site a defined by the total amount of solid waste and disposed of and degree of compaction. Characteristics of the wastes accepted by the site during the landfills active life. Concentrations and mass rate of release of both waterborne and airborne pollutants. Number of people and especially sensitive populations that could be influenced by the release of pollutants from the site.”
  • Physical Progress: 25%
  • Project End Date: 31 Oct 2022

DMA Zonation for Water Supply system (ABD area)-Phase II

Categories
OnGoing Projects

DMA Zonation for Water Supply system (ABD area)-Phase II

  • Name of the Project: DMA Zonation for Water Supply system (ABD area)-Phase II
  • Project cost (Rs.in Cr): 29.46
  • Description: Data collection, Field study, Reconnaisance Suvrey, Field Investigations has becce done on various factors and detailed Project Report prepared and conducted by TWIC for implementation.
  • Physical Progress: 27%
  • Project End Date: 31 Oct 2022

Development of commercial complex -3 locations

Categories
OnGoing Projects

Development of commercial complex -3 locations

  • Name of the Project: Development of commercial complex -3 locations
  • Project cost (Rs.in Cr): 10.52
  • Description:
    “SOUTHCOTTON ROAD: Rental Space – 4 nos shops -17 nos BORDER BAZZAR Shops- 16 nos Restraunt – 2nos offee Shop- 2 nos CARPENTER STREET Shops- 8 nos Show room rental space- 4 nos Coffee Shop, Foot court- 1no”
  • Physical Progress: 42%
  • Project End Date: 30 Jul 2022

Providing New Open Space Parks -4Nos

Categories
OnGoing Projects

Providing New Open Space Parks -4Nos

  • Name of the Project: Providing New Open Space Parks -4Nos
  • Project cost (Rs.in Cr): 10.49
  • Description:
    The following provision are made for development of parks. Compound wall, security room, Toilet arrangements, Lighting facilities, Sitting benches, Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements etc.
  • Physical Progress: 30%
  • Project End Date: 30 Jun 2022

Providing New Open Space Parks -8Nos

Categories
OnGoing Projects

Providing New Open Space Parks -8Nos

  • Name of the Project: Providing New Open Space Parks -8Nos
  • Project cost (Rs.in Cr): 13.88
  • Description:
    The following provision are made for development of parks. Compound wall, security room,Toilet arrangements, Lighting facilities,Sitting benches,Foot path, Play field arrangements, Green space development, Water supply and Electrical arrangements etc.
  • Physical Progress: 30%
  • Project End Date: 30 Jun 2022

Providing City Learning Centre at Stem Park (North Zone area)

Categories
OnGoing Projects

Providing City Learning Centre at Stem Park (North Zone area)

  • Name of the Project: Providing City Learning Centre at Stem Park (North Zone area)
  • Project cost (Rs.in Cr): 14.99
  • Description:
    provision are made Bike parking in Basement floor,Study centre and Toilet arrangements and 2d floor ,Electrical arrangements lighting facilities, arrangements and water supply arrangements etc., in this work.
  • Physical Progress: 15%
  • Project End Date: 30 Sep 2022

Providing Stem Park at North Zone area

Categories
OnGoing Projects

Providing Stem Park at North Zone area

  • Name of the Project: Providing Stem Park at North Zone area
  • Project cost (Rs.in Cr): 14.71
  • Description:
    “The following provision are made mini-theatre, science zone, energy zone, Mathematics zone, engineering and material science, space zone, evolution park models, indoor exhibits, science on a sphere and among others. It would be a good revenue generating model and also attract visitors, especially students from other neighbouring cities. Moreover, for a city such as Thoothukudi, the STEM Park and the learning centre would be a boon as it lacked any worthy entertainment for residents,., “
  • Physical Progress: 10%
  • Project End Date: 30 Sep 2022

DMA Zonation for Water Supply system (ABD area)-Phase-I

Categories
OnGoing Projects

DMA Zonation for Water Supply system (ABD area)-Phase-I

  • Name of the Project: DMA Zonation for Water Supply system (ABD area)-Phase-I
  • Project cost (Rs.in Cr): 29.37
  • Description:
    “1.Providing total length of 4587m of channels for diversion of Kalangarai odai to periyapallam odai with motorable service as per NHAI guidelines and related works along NH -45B 2.Providing total length of 3885m of Strom water drain for diversion of flow of chengulam odai to upparu river and related works along NH -7A”
  • Physical Progress: 27%
  • Project End Date: 31 Oct 2022

System for the TCMC Water Supply Improvement Scheme

Categories
OnGoing Projects

System for the TCMC Water Supply Improvement Scheme

  • Name of the Project: Proposed Centralised SCADA system demand driven-Water Supply & Distribution Management System for the TCMC Water Supply Improvement Scheme
  • Project cost (Rs.in Cr): 8.47
  • Description:
    84 MLD of raw water from Intake Well located at 100m away from upstream of Maruthur Dam at Kaliyavoor in River Thamirabarani being pumped to the Water Treatment Plant at Keelavallanadu, with the supporting of 4 nos of 600HP/450KW Vertical Turbine Pump sets. It is designed to operate 2 Nos of 600HP Vertical Turbine Pump sets parallelly at a time to pump as per the designed quantity of 84 MLD raw water from the existing source. The pumped raw water conveyed through size of 1100mm dia SWMS pipe to Water Treatment Plant at Keelavallanadu for a distance 10.85Km.From the Water Treatment Plant at Keelavallanadu, the treated clear water will be gravitated to the beneficiaries of TCMC limit. The clear water transmission main of size 1200mm dia SWMS pipe is laid for the distance of 25 Kms with the provision of sufficient sluice valve / scour valve arrangements. According to the design of the project, the treated clear water is being feed through 30 Nos OHTS comprises 13 Feeder Main and segregated to 30 Zones.
  • Physical Progress: 65%
  • Project End Date: 31 Mar 2022